Platform | |||||||||||
| General information | |||||||||||
| Other names | Xiwadi (西洼地) | ||||||||||
| Location | Donggaodi Subdistrict, Fengtai District, Beijing China | ||||||||||
| Operator | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
| Line | Line 8 | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | December 30, 2018 (2018-12-30) | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Donggaodi station[1] (Chinese: 东高地站; pinyin: Dōnggāodì zhàn) is a station on Line 8 of the Beijing Subway. It opened on December 30, 2018.[2]
Station layout
The station has an underground island platform.
Exits
There are 3 exits, lettered A, B, and D. Exit B is accessible.
References
- "Jpg格式线路图下载 | 北京地铁官方网站".
- "两条地铁新线开通试运营". Archived from the original on December 30, 2018.