Hongyancun 红岩村 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Chinese name | |||||||||||||||||||
| Traditional Chinese | 紅岩村 | ||||||||||||||||||
| Simplified Chinese | 红岩村 | ||||||||||||||||||
| Hanyu Pinyin | Hóngyáncūn | ||||||||||||||||||
| Literal meaning | 'Red Rock Village' | ||||||||||||||||||
| |||||||||||||||||||
| General information | |||||||||||||||||||
| Location | Chongqing China | ||||||||||||||||||
| Coordinates | 29°33′13″N 106°29′22″E / 29.5535157°N 106.4895489°E / 29.5535157; 106.4895489 | ||||||||||||||||||
| Operated by | Chongqing Rail Transit Corp., Ltd | ||||||||||||||||||
| Lines | Line 5 Line 9 | ||||||||||||||||||
| Platforms | 1 island platform 2 side platforms | ||||||||||||||||||
| Construction | |||||||||||||||||||
| Structure type | Underground | ||||||||||||||||||
| Other information | |||||||||||||||||||
| Station code |
/
/
| ||||||||||||||||||
| History | |||||||||||||||||||
| Opened | 25 January 2022 (2022-01-25)[1] (Line 9) 30 November 2023 (2023-11-30)[2](Line 5) | ||||||||||||||||||
| Services | |||||||||||||||||||
| |||||||||||||||||||
| |||||||||||||||||||
Hongyancun is a station on Line 9 of Chongqing Rail Transit in Chongqing Municipality, China[3] that opened in 2022.[1] It is located in Yuzhong District. Line 5 also reaches the station since November 2023.[2]
The station is the deepest metro station in the world. The deepest point of the station is 116 meters (381 ft) below street level[4][5][6][7] and the top of rail is 106 meters (348 ft) below the surface.[8] Regardless, the depth breaks China's previous record depth of Line 10's Hongtudi station[9] and surpasses the depth of the Kyiv Metro's Arsenalna station, the previous record for deepest metro station.
The vertical height difference between Entrance 2 and Entrance 4 of the station is over 141 meters (463 ft).[10] From Entrance 2, passengers will need to take a three-segment ascending moving walkway that is approximately 105 meters long, and it takes about 6 minutes to access the Line 9 platform; while from Entrance 4, its a seven-segment descending escalator ride that takes about 8 minutes (if not by lift).[11]
See also
References
- "轨道交通9号线一期通车啦!从高滩岩到兴科大道全程58分钟". cqjtkt.cn. 26 January 2022. Archived from the original on 16 February 2022. Retrieved 5 May 2022.
- "重庆5号线红岩村站最新消息". cq.bendibao.com (in Chinese). 29 November 2023. Retrieved 5 July 2024.
- "重庆轨道交通运营线网图". cqmetro.cn. Archived from the original on 17 April 2022. Retrieved 5 May 2022.
- "重庆轨道交通9号线一期工程正式通车试运营". cq.news.cn. Retrieved 14 March 2023.
- "重庆轨道9号线红岩村站将成为全国最深地铁站_央广网". cq.cnr.cn. Retrieved 14 March 2023.
- "重庆9号线一期开通 化龙桥站再现"轨道穿楼"-中国科技网". www.stdaily.com. Retrieved 15 March 2023.
- "关于轨道交通9号线一期,你想知道的,都在这儿啦!_重庆市人民政府网". www.cq.gov.cn. Retrieved 15 March 2023.
- "全国最深地铁站红岩村站主体开挖初支完成". tunn.cscec.com. Archived from the original on 3 February 2022. Retrieved 14 March 2023.
- "重庆轨道9号线红岩村站将成为全国最深地铁站". cq.cnr.cn. 22 July 2020.
- "轨道交通九号线红岩村站预计明年2月完工". www.cqcb.com. 14 August 2020. Retrieved 5 July 2024.
- "轨道九号线开通第二天 记者"深度"体验红岩村站". www.cqcb.com. 26 January 2022. Retrieved 5 July 2024.
