This article lists all power stations in Sudan.
Hydroelectric power stations
| Name | Community | Coordinates | Type | Capacity (MW) | Year completed | River | Ref |
|---|---|---|---|---|---|---|---|
| Roseires | Ad-Damazin | 11°47′56″N 34°23′17″E / 11.79889°N 34.38806°E / 11.79889; 34.38806 (Roseires Dam) | Reservoir | 280 MW | Blue Nile | [2] | |
| Merowe | 18°40′08″N 32°03′09″E / 18.66889°N 32.05250°E / 18.66889; 32.05250 (Merowe Dam) | Reservoir | 1,250 MW | 2009 | Nile | [3] | |
| Shereyk | Reservoir | 350 MW prop. | Proposed, not installed | Nile | [4] | ||
| Upper Atbara and Setit | 14°14′58.2″N 35°55′47.7″E / 14.249500°N 35.929917°E / 14.249500; 35.929917 (Atbara and Setit Dam) | Reservoir | 320 MW prop. | 2017 - proposed | [5] | ||
| Kajbar | Reservoir | 300 MW prop. | Proposed, not installed | Nile | [6] | ||
| Jebel Aulia | Jabal Awliya | 15°14′19″N 32°28′37″E / 15.23861°N 32.47694°E / 15.23861; 32.47694 (Jabal Awlia Hydroelectric Power Plant) | Reservoir | 35 | 1937 | ||
| Sennar | Reservoir | 15 | 1925 | Nile | [7] | ||
| Khashm el-Girba | 14°55′31.2″N 35°54′26.6″E / 14.925333°N 35.907389°E / 14.925333; 35.907389 (Khashm el-Girba Dam) | Reservoir | 10 | 1964 |
Thermal
| Name | Community | Coordinates | Type | Capacity (MW) | Year completed | Ref |
|---|---|---|---|---|---|---|
| Um-Dabakir | Kosti | Crude oil (steam turbines) | 500 MW | 2016 | [8] | |
| El Jaili | Garri Expansion 1&2 | 16°07′12″N 32°41′31″E / 16.12000°N 32.69194°E / 16.12000; 32.69194 (El Jaili CCGT Power Station) | Combined cycle gas turbine | 410 MW | 2007 | [9] |
| Garri expansion 3 | Gas turbines | 450 MW | Under const. | |||
| Garri expansion 4 | Coke | 100 MW | ||||
| Khartoum Noth S | Kafouri | Steam turbine | 380 MW | |||
| Khartoum Noth G | Gas turbine | 180 MW | ||||
| Port Sudan | Diesel |
See also
References
- "Hydroelectric Power Plants in Egypt & Sudan". Gallery. Power Plants Around The World. 2 March 2013. Retrieved 1 March 2014.
{{cite web}}: CS1 maint: deprecated archival service (link) - "Sudan completes expansion of 1,800-MW Roseiris hydropower project". Hydro World. 1 February 2013. Archived from the original on 1 March 2014. Retrieved 2 March 2014.
- Merowe Dam opened on 3 March 2009
- Sudan's Power Plants on the Nile River Archived 10 July 2009 at the Wayback Machine
- Sudan inaugurates US$1.9 billion Upper Atbara and Setit Dam hydropower project
- Kajbar Capacity is 300 MW
- "Sennar Hydroelectric Power Plant". Global Energy Observatory. Retrieved 2 March 2014.
- Sudan: 500M Um-Dabakir power station comes into service
- "Garri (El Jaili) CCGT Power Plant". Global Energy Observatory. Retrieved 1 March 2014.