Strait of Messina Bridge

☆ Save On Wikipedia ↗
Strait of Messina Bridge

Ponte sullo stretto di Messina
An artist's impression of the planned bridge from the Calabrian coast
Coordinates38°14′51″N 15°38′21″E / 38.24750°N 15.63917°E / 38.24750; 15.63917
CarriesSix lanes and two emergency lanes; two rail tracks and two railway sidewalks.
CrossesStrait of Messina
LocaleMessina and Villa San Giovanni
Characteristics
DesignSuspension bridge
Total length3,666 metres (12,028 ft)
Height399 metres (1,309 ft) (pylons)
Longest span3,300 metres (10,800 ft)
Clearance below76 metres (249 ft)
History
DesignerStretto di Messina
Construction startTBD[1]
Construction endTBD[2]
Location
Interactive map of Strait of Messina Bridge

The Strait of Messina Bridge (Italian: Ponte sullo stretto di Messina) is a proposed 3.6-kilometre (2+14 mi) suspension bridge across the Strait of Messina, connecting Torre Faro on the Italian island of Sicily with Villa San Giovanni in Calabria on the Italian mainland.[3] If built, it would be the longest suspension bridge in the world and part of the Berlin–Palermo railway axis of the Trans-European Transport Networks.

While a bridge across the Strait of Messina had been proposed since ancient times, the first detailed plan was made in the 1990s, for a suspension bridge. The project was cancelled in 2006 under Prime Minister Romano Prodi,[4] revived in 2009 under Silvio Berlusconi,[5] and cancelled again in 2013 under Mario Monti.[6] It was resurrected again in 2023 under Giorgia Meloni[7][8][9] and received final government approval in August 2025.[10] However, in October, Italy's Court of Audit rejected the proposal.

The proposal has drawn concerns connected with earthquakes, strong currents in the strait, disruption of bird migration routes, and a possibility of infiltration into the bridge's construction by the mafia groups Cosa Nostra and 'Ndrangheta.[11]

Geography

A 2002 NASA photo of the Strait of Messina. The bridge is expected to connect north Messina with Villa San Giovanni.

The Strait of Messina is a funnel-shaped arm of sea that connects the Ionian Sea in the south to the Tyrrhenian Sea to the north. The width of the strait varies from a maximum of approximately 16 km (9.9 miles), between Capo d'Alì in Sicily and Punta Pellaro in Calabria, to a minimum of approximately 3 km (1.9 miles) between Capo Peloro in Sicily and Torre Cavallo in Calabria.[12] A similar distance separates Pezzo and Ganzirri. At that point, the strait is only 72 m (236 ft) deep, while in other places, it can reach 200 m (660 ft) deep. In addition to strong tidal currents, the region's significant seismic activity will pose a challenge to the bridge's construction.[13][14][15][16]

History

The idea of a bridge crossing the strait is an old one. The Romans considered building a bridge joining Calabria and Sicily, which was to be constructed from boats and barrels. Pliny the Elder, a philosopher and Roman military leader born in AD 23, wrote of a plan to bridge the strait with a series of connecting boats.[17] The idea was abandoned, as it was clear that more traffic plied the strait in a north-south rather than east-west direction, so any structure on water could not be permanent.[18]

Charlemagne considered joining the two sides with a series of bridges. This idea was revived by the Norman adventurer Robert Guiscard in the 11th century and by Roger II of Sicily in the 12th.[19] In 1876, the politician Giuseppe Zanardelli was convinced that the strait could be linked by either a bridge or a tunnel.[20] In 1866, the public works minister, Stefano Jacini, turned to Alfredo Cottrau, an internationally renowned engineer, to design a planned bridge between Calabria and Sicily.[21]

In 1870, Navone proposed building a tunnel, based on Napoleon's failed 1802 proposal of a Channel Tunnel running below the English Channel. It was to start at Contesse and pass below Messina and Ganzirri at a depth of 150 m (490 ft), crossing the strait to Punta Pezzo and resurfacing at Torre Cavallo.[22]

In 1909, a geological study of the strait was published (historical Arch. Sicilian year XXXIV f.1,2). In 1921, a study of an undersea tunnel was released to the Geographic Conference of Florence. A group of railway civil engineers studied the possibility of a suspension bridge, but nothing came of it.[23]

In 1953, the idea was revived by the American civil engineer David B. Steinman, with a plan to build a bridge that crossed the strait using two 220 m (720 ft) towers sunk 120 m (390 ft) into the seafloor. The proposed 1,524 m (5,000 ft) span would have represented a world record, eclipsing the then-longest 1,275 m (4,183 ft) centre span of the Golden Gate Bridge and longer than the 2,256 m (7,402 ft) Mackinac Bridge, then in planning, with a total length of 2,988 m (9,803 ft). The proposed structure was to clear the sea by 50 m (160 ft) for navigation and have two decks—a lower deck carrying two rail lines, and 7 m (23 ft) above, a road deck 30 m (98 ft) wide. The main cables were designed with a diameter of 1 m (39 in). Construction of the bridge would have required 12,000 workers and cost hundreds of billions of lire.[24]

Modern attempts to build the bridge

Early planning stages

Oudry's bridge proposal (1852)

Project for a rigid and oscillation-free bridge for ordinary traffic and high-speed railway trains to be built over the Strait of Messina: proposed by Alphonse Oudry, engineer in the Imperial Corps of Bridges and Roads of France.

One of the earliest documented proposals for a permanent crossing of the Strait of Messina was developed in 1852 by the French engineer Alphonse Oudry, a member of the Corps impérial des ponts et chaussées of France. His concept envisioned a four-span bridge linking Sicily to mainland Italy, representing one of the first international engineering studies dedicated to a fixed connection across the strait.[25]

The proposal was described in French technical documentation as Projet d'un pont à quatre travées, proposé pour franchir le détroit de Messine and reflected the growing 19th-century interest in large-scale transport infrastructure and railway expansion. Oudry's design aimed to provide both road and rail connectivity between the island and the Italian mainland.[26]

In 1862, Oudry expanded the concept with a revised study entitled Projet d'un pont indéformable et sans oscillations pour circulation ordinaire et trains de chemin de fer passant à toute vitesse à établir sur le détroit de Messine. The project emphasized structural rigidity and reduced oscillation, proposing a bridge capable of supporting conventional traffic as well as railway trains operating at high speed.[27]

Oudry's studies are considered among the earliest modern engineering attempts to demonstrate the technical feasibility of a stable crossing over the Strait of Messina, anticipating later proposals developed throughout the late 19th and 20th centuries.[28]

Others

  • In the 1960s, a wide variety of proposals were advanced, including everything from submerged tubes to floating struts, pontoons, and a revolving central section of the bridge. None turned out to be realistic.
  • In 1968, an international design competition was arranged.[29]
  • In the 1970s, feasibility studies were undertaken by the state railways, leading to the creation of a private company with responsibility for planning the strait's crossing.[29]
  • In the 1980s, the Messina Strait Company was set up with support from the state railways, the regions, and the Istituto per la Ricostruzione Industriale. It concluded that it would be feasible to build a suspension bridge.[29]
  • Detailed plans followed in the 1990s, with final approval from the High Council of Public Works (Consiglio Superiore dei Lavori Pubblici) on 10 October 1997.[30]

First Berlusconi government

Cross-sectional diagram of the proposed Strait of Messina Bridge. The numbers represent distances in metres.

The 2006 plan called for a single-span suspension bridge with a central span of 3,300 m (10,800 ft). This would have made the span more than 60% longer than the 1915 Çanakkale Bridge in Turkey—currently the longest suspension bridge in the world, at 2,023 m (6,637 ft).[31]

Plans called for four traffic lanes (two driving lanes and one emergency lane in each direction), two railway tracks, and two pedestrian lanes. In order to provide a minimum vertical clearance for navigation of 65 m (213 ft), the two towers were to be 382.6 m (1,255 ft) high. This would have been taller than the Millau Viaduct in France (then the world's tallest bridge, at 341 m (1,119 ft)). The bridge's suspension system would have relied on two pairs of steel cables, each with a diameter of 1.24 m (49 in) and a total length, between the anchor blocks, of 5,300 m (17,400 ft).[32]

The design included 20.3 km (12.6 miles) of road links and 19.8 km (12.3 miles) of railway links to the bridge. On the mainland, the bridge was to connect to the new stretch of the Salerno-Reggio Calabria motorway (A3) and to the planned Naples-Reggio Calabria high-speed rail line; on the Sicilian side, to the Messina-Catania (A18) and Messina-Palermo (A20) motorways as well as the new Messina railway station (to be built by Rete Ferroviaria Italiana).[33]

The bridge was planned to connect Reggio Calabria to Messina, the two cities that face each other on either side of the strait, in order to form a single metropolitan area. This ambitious urban project was called Area Metropolitana integrata dello Stretto ("integrated metropolitan area of the strait") or simply Città dello Stretto ("city of the strait"). Among the controversies surrounding the bridge's construction was strong, relentless opposition from various Sicilian nationalist groups, which explicitly objected to the formation of such a metropolitan area.[33]

Among the engineers who participated in the project was Giorgio Diana, who mainly dealt with the aeroelastic aspect.[34]

Contracting parties

A construction consortium, led by Impregilo, was selected in 2005, with work set to begin in the second half of 2006. The bridge was designed by Danish architects at Dissing+Weitling in close collaboration with the Danish engineering firm COWI.[35] In March 2006, Impregilo and Stretto di Messina signed a contract assigning final project planning to a general contractor. Impregilo S.p.A., the lead partner, had a 45% share. Other participants were Spain's Sacyr (18.70%), the Italian companies Società Italiana per Condotte D'Acqua S.p.A. (15%) and Cooperativa Muratori & Cementisti-C.M.C. of Ravenna (13%), Japan's IHI Corporation (6.30%), and Consorzio Stabile A.C.I. S.c.p.a (2%).[36]

The general contractor would also be assisted by the Danish and Canadian companies COWI A/S, Sund & Baelt A/S, and Buckland & Taylor Ltd., who would handle project engineering. Completion was planned to take six years, at an estimated cost of €3.9 billion.[36]

The Akashi Kaikyo Bridge, built in 1998 in Japan by IHI Corporation, one of the companies in charge of constructing the Messina Bridge.
The Øresund Bridge, built in 1999 by COWI A/S, one of the companies that was supposed to be involved in constructing the Messina Bridge.
Contract of the Messina Bridge
FunctionCompaniesRole
General contractor
Italy Eurolink[37]
Italy Webuild (Impregilo until 2012)Group leader (45%)
Japan IHI Infrastructure Systems Co., Ltd.Mandator
Denmark COWI A/SMandator
Spain SacyrMandator
Italy Società Italiana per Condotte d'AcquaMandator
Italy Cooperativa Muratori & CementistiMandator
Italy Argo Costruzioni InfrastruttureMandator
Denmark Dissing+WeitlingMandator
Denmark Sund & Bælt A/SMandator
Canada Buckland & TaylorMandator
Project management United States Parsons Corporation
Environmental monitoring Italy FeniceGroup leader
Italy AgriconsultingMandator
Italy Eurisko NOP WorldMandator
Italy Nautilus Società CooperativaMandator
Italy TheolabMandator
Insurance broker United States Marsh

On 12 October 2006, the Italian Parliament voted 272 to 232 in favour of abandoning the plan due to the bridge's "doubtful usefulness and viability" and the inability of the already burdened Italian treasury to bear its share of the cost. Transport minister Alessandro Bianchi stressed that the road and rail links leading to the location of the proposed bridge are not capable of supporting enough traffic to make its construction economically feasible. Other reasons for abandoning the plan were earthquake risk and fears that the bridge would enrich the networks of organized crime in Italy, such as Cosa Nostra and 'Ndrangheta.[4][38]

Second Berlusconi government

In April 2008, Silvio Berlusconi was re-elected Prime Minister of Italy and vowed to restart the project to build the bridge. The following month, Altero Matteoli, Italy's minister of infrastructure and transport, confirmed the government's intent to restart work on the bridge in a letter to Pietro Ciucci, the president of Società Stretto di Messina.[39]

In March 2009, as part of a massive new public works programme, Berlusconi's government announced that plans to construct the Messina bridge had been revived, pledging €1.3 billion as a contribution to its estimated cost of €6.1 billion. Berlusconi claimed that work would be completed by 2016. Until 2006, when the project was halted, the work had been assigned to a consortium of Impregilo (now called Webuild), Condotte d'Acqua, Cooperativa Muratori & Cementisti, and Consorzio Stabile A.C.I., alongside Spain's Sacyr and Japan's IHI Corporation.[31]

In December 2009, preparatory work began, with the diversion of the Tyrrhenian railway at Cannitello on the Italian mainland side of the strait.[40]

In February 2013, the project was shut down by Prime Minister Mario Monti, for lack of funds.[6]

Renzi government

In September 2016, the project was reconsidered by the government of Matteo Renzi.[41]

Conte government

In June 2020, during the COVID-19 pandemic, Prime Minister Giuseppe Conte brought up the topic of the bridge, declaring that the government would evaluate the resumption of work without prejudice.[42][43]

In April 2021, the CEO of Webuild, Pietro Salini, in a joint press conference with the President of the Sicilian Region, Nello Musumeci, announced that he was ready to build the Strait of Messina Bridge, starting immediately with the work and on the basis of the executive project and construction site approved definitively in 2013. He declared that he already had the four-billion-euro coverage necessary for the construction and that he could obtain the other two necessary for the infrastructures connected to it from private financing.[44][45]

Meloni government

On 16 March 2023, the Italian government, under Prime Minister Giorgia Meloni, with Matteo Salvini as Minister of Infrastructure and Transport, approved a decree to proceed with the construction of the bridge by remodeling the existing project.[7]

On 19 March, WeBuild's Pietro Salini said work on the bridge should begin by 2024, with the project scheduled for completion in 2032.[46]

On 31 March, the Italian president, Sergio Mattarella, approved the Decreto Ponte ("bridge decree").[8]

In April 2025, Salvini announced that construction of the bridge would start in mid-2025 and would comply with all environmental standards.[47]

In August 2025, the Meloni government gave final approval to the project, allowing construction on the bridge to commence. It indicated that it would consider the bridge as a defence-related expense to count towards a NATO spending target.[48] In September, the United States government said it disapproved of the strategy, calling it "creative accounting".[49] On 30 October, Italy's Court of Audit rejected the proposal to build the bridge.[50]

In February 2026, Infrastructure Minister Matteo Salvini said a government decree would keep the project's cost set at €13.5 billion, and he reiterated that work should begin in 2026, without committing to further deadlines.[51][52]

Imminent start of construction work

According to several institutional and economic sources, the Strait of Messina Bridge project had reached an advanced stage by early 2026, in preparation for the start of construction.[53] This development followed a roadmap publicly presented by Pietro Ciucci, chief executive officer of Stretto di Messina, during a press interview on 21 February 2024.[54]

A first formal milestone was reached with the approval of Resolution No. 41 by CIPESS on 6 August 2025.[55] However, on 29 October 2025, the Court of Audit declined to validate the resolution, preventing it from entering into force.[56] Without this approval, publication in the Gazzetta Ufficiale could not produce legal effects, delaying what might otherwise have been a construction start as early as November 2025.[57]

Throughout 2026, the competent authorities—including the Ministry of Infrastructure and Transport, Stretto di Messina S.p.A., and the Webuild group—worked to address the observations raised by the Court of Audit.[58][59]

These observations primarily concerned four issues:

  • updating information related to IROPI ("Imperative Reasons of Overriding Public Interest"), already recognized at the European Union level;[60]
  • obtaining a new opinion from the Superior Council of Public Works, despite a favorable opinion already issued for the preliminary project on 17 October 1994;[61]
  • requesting an assessment of the financial plan from the Transport Regulation Authority;[62]
  • clarifying issues related to an alleged 50% increase in contract value, in compliance with Article 72 of Directive 2014/24/EU on public procurement.[63]

According to statements made by Pietro Ciucci, chief executive officer of Stretto di Messina S.p.A., a new CIPESS resolution was expected to be finalized by September 2026 and submitted with prior validation by the Court of Audit, potentially enabling the effective start of construction work.[64]

Belvedere dello Stretto

Concept and design

On 14 March 2024, Stretto di Messina S.p.A. made the designer's report public. On page 417, the idea of enhancing the bridge as a tourist attraction was introduced for the first time. The report mentions a panoramic belvedere located at the third crossbeam and on both towers, at a height of 374 meters.[65]

3.5.1.10 Architectural Design of the Belvedere

As requested by Società Stretto di Messina during the meeting of 27 November 2023, recorded in minutes CS_005, the General Contractor shall further develop, during the Executive Design phase, a feasibility study concerning public panoramic access within both towers of the Crossing Structure.

The concept shall provide visitor access inside the structure either through service elevators reconfigured for this purpose or through additional elevators. The panoramic access point shall be located at the second or third crossbeam level.

The feasibility study shall necessarily take into account parameters such as visitor comfort (vibrations), infrastructure and public safety, landscape considerations, as well as structural and functional aspects. In any case, the surrounding conditions shall remain unchanged, including the fundamental characteristics (geometry and materials) of the tower legs.

Economic evaluations shall be deferred to the Executive phase.

Based on the above considerations, the following preliminary design concept is proposed.[66]

IL PROGETTISTA: Dott. Ing. Marco Orlandini, Ordine Ingegneri Roma n° 14340, From page 417 of the Designer's Report, 14 March 2024

Tourism enhancement of cross-elements

Palamara conceived a strategic vision for the "Tourism enhancement of cross-elements" (valorizzazione turistica dei trasversi) in February 2024. The project proposed transforming the structural crossbeams (transversal beams) of the bridge's deck into observatory decks or functional spaces for international tourism.[67] This concept was officially presented to the Bridge Commission at Palazzo Zanca on 29 November 2024, emphasizing the bridge not only as a transport link but as a standalone destination.[68]

The preliminary design was developed by Webuild, in dialogue with the technical proposals of engineer Giuseppe Palamara, while the Danish firm COWI, as was also the case for the executive design of the Messina Bridge project, is responsible for the detailed structural design and wind tunnel testing.[69][70]

Challenges and criticisms

The bridge has been regarded as highly controversial due to the impact of earthquakes, strong currents in the strait, concerns about disruption of bird migration routes,[71] and possible infiltration of the mafia groups Cosa Nostra and 'Ndrangheta into construction projects.[11]

Seismic activity and strong winds have been cited as the largest structural issues the bridge faces.[72][73] The span must withstand earthquakes with a maximum intensity of 7.8 Mw, greater than the 1908 Messina earthquake.[74][75]

Since its inception, the bridge has faced sustained opposition from environmental, civic, and territorial movements, especially in Messina. One of the most prominent groups has been Rete No Ponte, a network of associations and committees that since the early 2000s has organized public campaigns, legal challenges, assemblies, and large demonstrations involving tens of thousands of participants.[76]

After the project was revived in 2023, Rete No Ponte was supplanted by new organizations, such as Assemblea NO ponte, Comitato No Ponte Capo Peloro, Invecedelponte, and youth-, university-, and teacher-based anti-bridge groups. Among them, Assemblea NO ponte in particular emerged as a broad, horizontally organized, and politically radical actor, structured as an open space for participation that brings together committees, collectives, associations, trade unions, and individual citizens. The group opposes not only the bridge itself but also the broader development model associated with large infrastructure projects, emphasizing grassroots participation, territorial defense, and criticism of the political and economic interests tied to the project.[77]

Their activities include protests, public meetings, anti-expropriation campaigns, legal actions, and cultural initiatives. A major demonstrations took place in August 2025, with thousands of people in Messina protesting against the bridge's construction.[78]

Similar opposition movements have also emerged on the Calabrian side of the strait, particularly in Villa San Giovanni and Cannitello, where local committees have protested the expected environmental and social impacts of the bridge and related infrastructure projects.[79]

See also

References

  1. Amante, Angelo; Fonte, Giuseppe (19 May 2025). "Work on long-debated bridge to Sicily could begin in coming months". Reuters. Retrieved 10 June 2025.
  2. "Messina Bridge construction to start end-April, end 2032". ansa.it. 14 March 2025. Retrieved 12 April 2025.
  3. Sylvers, Eric (26 July 2023). "Italy Says it Will Build the Longest Suspension Bridge in the World. Don't Hold Your Breath". The Wall Street Journal. Archived from the original on 10 January 2024. Retrieved 10 January 2024.
  4. "Italy drops Sicily bridge plans". BBC News. 12 October 2006. Archived from the original on 25 May 2017. Retrieved 12 October 2006.
  5. "Italy revives Sicily bridge plan". BBC News. 6 March 2009. Archived from the original on 31 August 2017. Retrieved 17 May 2011.
  6. Masoni, Danilo (26 February 2013). "Sicily bridge project sinks in Italy budget mire". Reuters. Retrieved 7 August 2025.
  7. "Cabinet approves Messina Bridge decree – 'Historic day for Italy' says Infrastructure Minister Salvini". Agenzia Nazionale Stampa Associata. 17 March 2023. Archived from the original on 20 March 2023. Retrieved 20 March 2023.
  8. "Il Ponte sullo Stretto è legge: Mattarella firma, il decreto è in Gazzetta Ufficiale". strettoweb.com (in Italian). 31 March 2023.
  9. "Déjà Vu? Italy Plans to Build World's Longest Suspension Bridge to Sicily". IFLScience. 16 February 2024. Retrieved 18 February 2024.
  10. "Italy gives final go-ahead for landmark Sicily bridge project". reuters.com. 6 August 2025. Retrieved 6 August 2025.
  11. Nadeau, Barbie Latza (30 April 2023). "Italy wants to build the world's longest suspension bridge. The Mafia and geography might make that difficult". CNN.
  12. "Sicily (island, Italy) – Britannica Online Encyclopedia". Encyclopædia Britannica. 17 February 2009. Archived from the original on 4 May 2015. Retrieved 20 February 2011.
  13. "Messina Strait, Italy". earthobservatory.nasa.gov. 29 April 2007. Retrieved 30 October 2025.
  14. "Currents in the Straits of Messina". Nature. 73 (1904): 621. 1 April 1906. Bibcode:1906Natur..73Q.621.. doi:10.1038/073621a0. ISSN 1476-4687.
  15. admin (22 January 2025). "Strait of Messina Bridge: seismic issues, fault lines, bridge height, ships in transit, suspension cables and other useful information on the project's design – Stretto di Messina S.p.A." Retrieved 30 October 2025.
  16. "New Study on Seismicity in the Strait of Messina | Consiglio Nazionale delle Ricerche". cnr.it. Retrieved 30 October 2025.
  17. "Il ponte romano sullo stretto di Messina nel III a.C. è stato davvero realizzato? Al 99% no" [Was the Roman bridge over the Strait of Messina actually built in the 3rd century BC? 99% of the time, no.]. geopop.it (in Italian). 22 September 2023. Retrieved 26 April 2026.
  18. "When Planning a Bridge is No Small Decision". italicsmag.com. 3 June 2021. Retrieved 7 August 2025.
  19. "Il Ponte sullo Stretto di Messina (un progetto mai realizzato)" [The Messina Strait Bridge (a project never built)] (PDF). unina.it (in Italian). Retrieved 26 April 2026.
  20. "Il ponte sullo Stretto: tra progetti e sogni. Parte 1" [The Strait of Messina Bridge: Between Projects and Dreams. Part 1]. lalampadadellescienze.it (in Italian). 23 January 2024. Retrieved 26 April 2026.
  21. "E' del cremonese Stefano Jacini, ministro dei lavori pubblici del governo La Marmora nel 1866, il primo progetto del ponte sullo stretto di Messina" [The first project for the bridge over the Strait of Messina was by Stefano Jacini from Cremona, minister of public works in the La Marmora government in 1866.]. cremonasera.it (in Italian). 5 December 2022. Retrieved 25 April 2026.
  22. "Ponte sullo Stretto di Messina, un dibattito lungo 145 anni" [The Messina Strait Bridge: A 145-Year-Old Debate]. rainews.it (in Italian). 29 September 2015. Retrieved 25 April 2026.
  23. "Il mitico Ponte sullo Stretto di Messina" [The legendary bridge over the Strait of Messina] (PDF). researchgate.net (in Italian). 29 September 2015. Retrieved 25 April 2026.
  24. "Progetto del ponte sospeso dell'Ing. David Bernard Steinman" [Suspension Bridge Project by Engineer David Bernard Steinman]. researchgate.net (in Italian). Retrieved 26 April 2026.
  25. Imbesi, Paolo (2000). Il concorso internazionale di idee per il ponte sullo Stretto di Messina: le premesse e i progetti [The international competition for ideas for the bridge over the Strait of Messina: the premises and the projects] (in Italian). Rome: Gangemi Editore.
  26. Mollica, Nino (1995). "Il Ponte sullo Stretto di Messina nella cultura tecnica dell'Ottocento" [The Messina Strait Bridge in 19th-Century Technical Culture]. Archivio Storico Messinese (in Italian). 66: 143–158.
  27. Cianciolo Cosentino, Giovanni (2010). Storia del Ponte sullo Stretto di Messina [History of the Messina Strait Bridge] (in Italian). Soveria Mannelli: Rubbettino Editore.
  28. "History of the Messina Bridge". Ponte di Messina. Retrieved 25 April 2026.
  29. "Quali sono le principali tappe della storia del Ponte sullo Stretto di Messina?" [What are the main milestones in the history of the Messina Strait Bridge?]. strettodimessina.it (in Italian). Retrieved 25 April 2026.
  30. "legge n. 443/2001 ponte sullo stretto di messina" [Law No. 443/2001: Bridge over the Strait of Messina]. mite.gov.it (in Italian). Retrieved 25 April 2026.
  31. Sicily to get longest bridge from TimesOnline www.timesonline.co.uk Archived 17 August 2011 at the Wayback Machine. Accessed 8 March 2009.
  32. Italy revives Messina Straits bridge from Construction Europe. www.khl.com Archived 13 July 2011 at the Wayback Machine Accessed 9 March 2009.
  33. "Ponte sullo Stretto: un maxi-documento contro le "bugie pubblicate dalla stampa locale"" (in Italian). strettoweb.com. 17 December 2013. Archived from the original on 22 June 2020. Retrieved 21 June 2020.
  34. "Giorgio Diana – Professore emerito del Politecnico di Milano". polimi.it (in Italian). Retrieved 26 July 2024.
  35. "Sicily bridge constructor named". BBC News. 12 October 2005. Archived from the original on 16 October 2005. Retrieved 15 October 2005.
  36. "Impregilo and Stretto di Messina close contract" (PDF). 18 November 2008. Archived from the original (PDF) on 8 March 2016. Retrieved 26 April 2026.
  37. "Salini Impregilo cambia nome: da oggi nasce Webuild – la Repubblica". Repubblica.it. 4 May 2020. Archived from the original on 28 March 2023. Retrieved 4 May 2020.
  38. Hooper, John (12 October 2006). "Italian MPs kill plan to bridge Sicily and mainland". The Guardian. Archived from the original on 18 November 2007. Retrieved 17 December 2016.
  39. "Italian minister commits to Messina Bridge". Bridge Design and Engineering. 27 May 2008. Archived from the original on 6 July 2009.
  40. "Ponte stretto: al via i lavori (Straits bridge: Work begins)" (in Italian). ItaliaOnLine. 23 December 2009. Archived from the original on 18 May 2016.
  41. Samuels, Gabriel (27 September 2016). "Italian PM Matteo Renzi revives plan for bridge from mainland Italy to Sicily". The Independent.
  42. "Use crisis to redesign country – Conte". Agenzia Nazionale Stampa Associata. 3 June 2010. Archived from the original on 5 June 2020. Retrieved 5 June 2020. As for a revived proposal to build a bridge across the Messina Strait to Sicily, Conte said "I will evaluate everything without prejudice".
  43. "Conte: "On EU funds, comparison with everyone, it is not a treasure of the government"". archyde.com. 4 June 2010. And the Messina bridge? "I will also evaluate without prejudice the bridge over the strait."
  44. ""Il Ponte sullo Stretto? Ce lo facciamo da soli": il patto di Musumeci con Salini" (in Italian). lasicilia.it. 22 April 2021. Archived from the original on 6 December 2021. Retrieved 22 April 2021.
  45. "Ponte Stretto: Salini, è cantierabile, siamo pronti a farlo". Agenzia Nazionale Stampa Associata (in Italian). 22 April 2021. Archived from the original on 22 April 2021. Retrieved 22 April 2021.
  46. "Pietro Salini at "Quarta Repubblica": We are ready to build the Strait of Messina Bridge – WeBuild Group". webuildgroup. Retrieved 7 April 2024.
  47. Ingiusto, Nunzio (7 April 2025). "Strait Bridge: Construction Sites to Begin in Mid-2025, but Environmentalists Announce New Legal Actions". FIRSTonline. Retrieved 2 June 2025.
  48. "Italy greenlights a $15.5 billion project to build bridge linking Sicily to the mainland". AP News. 6 August 2025. Retrieved 6 August 2025.
  49. "US warns against counting Messina Bridge as NATO spending". portseurope.com. 3 September 2025. Retrieved 4 September 2025.
  50. "Italian court rejects Sicily bridge project, dealing a blow to Meloni government". AP News. 30 October 2025. Retrieved 3 November 2025.
  51. Ferrazza, Riccardo; Landolfi, Flavia (10 March 2026). "Strait Bridge, EUR 2.8 billion slipping. Salvini: on the start of work, I give no more deadlines". Il Sole 24 ORE. Retrieved 12 March 2026.
  52. "Work on Messina Strait bridge should start this year – Salvini – Politics – Ansa.it". Agenzia ANSA. 6 February 2026. Retrieved 12 March 2026.
  53. "Ponte sullo Stretto, cantieri aperti entro la fine del 2026: costi a 10 miliardi" [Strait of Messina Bridge, construction work to begin by the end of 2026: cost at €10 billion.]. QuiFinanza (in Italian). 28 March 2026. Retrieved 21 April 2026.
  54. "Ponte sullo Stretto, l'ad Ciucci: «Totale collaborazione. Le contestazioni? I tempi sono stati trasparenti»" [Strait of Messina Bridge CEO Ciucci: "Full cooperation. The protests? The timing was transparent".]. Corriere della Sera (in Italian). 21 February 2024. Retrieved 22 April 2026.
  55. "Delibera CIPESS n.41 del 6 agosto 2025" [CIPESS Resolution No. 41 of August 6, 2025]. Ministero delle Infrastrutture e dei Trasporti (in Italian). Retrieved 21 April 2026.
  56. "Controllo sulla delibera CIPESS relativa al ponte sullo Stretto" [Review of the CIPESS resolution regarding the Strait of Messina bridge]. Corte dei conti (in Italian). Retrieved 21 April 2026.
  57. "Ponte sullo Stretto, stop della Corte dei conti alla delibera CIPESS" [Strait of Messina Bridge: Court of Auditors blocks CIPESS resolution]. Il Sole 24 Ore (in Italian). Retrieved 21 April 2026.
  58. "Aggiornamenti sul progetto del Ponte sullo Stretto" [Updates on the Strait of Messina Bridge project]. Stretto di Messina S.p.A. (in Italian). Retrieved 21 April 2026.
  59. "Ponte sullo Stretto: aggiornamenti sul progetto" [Strait of Messina Bridge: project updates]. Webuild Group (in Italian). Retrieved 21 April 2026.
  60. "Riconoscimento IROPI del progetto Ponte sullo Stretto" [IROPI recognition of the Strait Bridge project]. Ministero delle Infrastrutture e dei Trasporti (in Italian). Retrieved 21 April 2026.
  61. "Pareri del Consiglio Superiore dei Lavori Pubblici sul Ponte" [Opinions of the Superior Council of Public Works on the Bridge]. Ministero delle Infrastrutture e dei Trasporti (in Italian). Retrieved 21 April 2026.
  62. "Parere ART sul piano economico-finanziario del Ponte sullo Stretto" [ART Opinion on the Economic and Financial Plan for the Strait of Messina Bridge]. Autorità di Regolazione dei Trasporti (in Italian). Retrieved 21 April 2026.
  63. "Ponte sullo Stretto e aumento dei costi: il nodo dell'articolo 72 della direttiva UE" [Strait of Messina Bridge and rising costs: the crux of Article 72 of the EU Directive]. Il Sole 24 Ore (in Italian). Retrieved 21 April 2026.
  64. "Ponte sullo Stretto, Ciucci: nuova delibera CIPESS pronta entro settembre" [Strait of Messina Bridge, Ciucci: New CIPESS resolution ready by September]. Il Sole 24 Ore (in Italian). Retrieved 21 April 2026.
  65. "Relazione del Progettista" [Designer's Report]. strettodimessina.it (in Italian). 14 March 2024. Retrieved 10 May 2026.
  66. "Relazione del Progettista – GER0326_revE.pdflanguage=it" [Designer's Report]. mite.gov.it. 14 March 2024. p. 417. Retrieved 10 May 2026.
  67. "Galileo n° 280 – Marzo 2025" (PDF). collegioingegneripadova.it (in Italian). p. 16. Retrieved 21 April 2026.
  68. "Ponte sullo Stretto, le torri sull'una e sull'altra sponda "attrarranno mezzo milione di turisti l'anno"" [The Strait of Messina Bridge, with towers on both sides, will "attract half a million tourists a year".]. Gazzetta del Sud (in Italian). 30 November 2024. Retrieved 20 April 2026.
  69. "Messina Bridge – Linking Italy and Sicily" [Designer's Report]. dissingweitling.com. Retrieved 10 May 2026. Together with engineer COWI, Dissing+Weitling designed the 3,690-metre-long suspension bridge which will be able to handle road and train traffic as well as two pedestrian lanes
  70. "Aspetti sismici e Faglie: il ponte è progettato con azioni sismiche e criteri che ne fanno una delle strutture sismicamente più sicure in Italia e nel mondo" [Seismic aspects and faults: the bridge is designed with seismic actions and criteria that make it one of the seismically safest structures in Italy and in the world]. strettodimessina.it (in Italian). 11 November 2024. Retrieved 10 May 2026. progetto redatto e aggiornato da Eurolink (principali, partner sono Webuild, IHI, Sacyr, Cowi massimo specialista di realizzazione di ponti sospesi nel mondo) [Project drafted and updated by Eurolink (the main partners are Webuild, IHI, Sacyr, Cowi, the world's leading specialist in the construction of suspension bridges)]
  71. "Sicily locals vow opposition to longest suspension bridge". RTÉ. 8 August 2025.
  72. "Messina Straits Bridge". Structurae. The greatest problem in designing the bridge is the aerodynamic stability of the deck under wind as well as seismic activity.
  73. Sabelli, Chiara (27 February 2024). "A bridge too far? Messina Strait project could finally join Sicily to the mainland". Nature Italy. Retrieved 9 May 2025.
  74. "The Strait of Messina Bridge Media Kit" (PDF). media.webuildgroup.com. webuildgroup.com. Retrieved 30 October 2025.
  75. "Seismic issues and faults: the bridge has been designed with measures and criteria that make it one of the most seismically safe structures in Italy and the rest of the world". strettodimessina.it. 11 November 2024. Retrieved 30 October 2025.
  76. "Ponte sullo Stretto, c'è chi dice no. Chi sono, e perchè è "no"" [Strait of Messina Bridge: Some Say No. Who They Are, and Why They're Saying "No"]. LetteraEmme (in Italian). 17 March 2023. Retrieved 21 May 2026.
  77. "Contro il ponte, tra studio e mobilitazione" [Against the bridge, between study and mobilization]. il manifesto (in Italian). 14 May 2026. Retrieved 21 May 2026.
  78. "Thousands march against plan to build massive bridge linking Sicily to Italy's mainland". AP News. 9 August 2025. Retrieved 11 August 2025.
  79. ""Opporsi è l'unico segno di amore per questi territori": No Ponte Calabria continua la sua lotta" ["Opposition is the only sign of love for these territories": No Ponte Calabria continues its fight.]. ReggioToday (in Italian). Retrieved 21 May 2026.

Further reading